banner
left right
 
Quick Menus
 
 
Electrical Services
 
 
 
call
 
 
 
 
 
 
 
 
Renovation gallery  arrow
Basement Improvement Part 1
Before Window Cut in Demolition
 
Laminate Flooring Finished Product  
 
Basement Improvement Part 2
Run down Kitchen Tiling Floor Finished Product
   
All done    
 
Basement Improvement Part 3
Run down Kitchen Tiling Floor Finished Product
 
Basement WC Improvement Part 4
Run down Kitchen Tiling Floor Finished Product
   
All done    
 
Basement WC Improvement Part 5
Run down Kitchen Tiling Floor Finished Product
   
All done    
 

Building Decks

 
Run down Building Decks Building Decks  
 

Repairing Walkways

Run down Walkways

Run down Walkways

After Finished

 

Room Development

Basement Development

Living Basements
almost finished

 

New Flooring install

Laminate Flooring

Run down Flooring

After Finished

   
After Finished    
 

Living Room Complete Renovation: small bar, new tiling, and complete new lighting system (pot lights, recessed)

Living Room

Look into kitchen

Bar and dining
area to the left

Another Wet bar

Run down
Tiling Bathrooms

Run down
Tiling Bathrooms
   

Installing Marble
tiles in bathroom

   
 

Installing stairs Cutting open floor

Installing stairs

Temporary support built

Installing 2-
Play new support for joists

Stairs installed

Joists anchored to beam

Before
New Kistchen

Before Stairs and bamboo

After Stairs and bamboo Before Flooring
   
After Flooring    
 
 
 
 
 
Renovation/
Trade Services
pic
 
youtueb
 
 
 
Copyright © 2008 5 Star Technical Services. All Rights Reserved.